REQUEST CPI-Condo-Garage Fire Prevention Certificate
01.06.2009 ALL THE ACTIVITIES 'that have been awarded by the NOP VV.F must obtain the certificate of fire prevention, is the agreed-on guidelines for DM 12/29/2005 exceeding the speed of provisional clearance under Article. 7 DPR 12.01.1998, n. 37.
For questions and addresses the first application to the Interior Ministry issued a circular No
Prot P194/4101 sott.135 / A of 20.02.2006.
OF THE FIRE DEPARTMENT OF PUBLIC AID AND CIVIL DEFENCE DIRECTORATE FOR PREVENTION CENTER SAFETY AND FIRE PREVENTION AREA TECHNICAL
Via Cavour, 5-00184 ROMA TEL. N. 06/46529232 FAX. N. 06/47887525
Prot No P194 / 4101 subt. 135 / A Rome, February 20, 2006
LETTER - THE CIRCULAR
-G. REGIONAL DIRECTOR OF THE FIRE
THEIR SEATS TO
-G. PROVINCIAL MASTERS OF THE FIRE THEIR SEATS
SUBJECT: DM 29 December 2005 laying down guidelines for exceeding the speed of nothing precludes provisional
under Article. 7 of Presidential Decree 12.1.1998, n.37. - Clarifications and
first application addresses
.- By the Decree of the Minister of 29 December 2005, Official Gazette No
26, 1 February 2006 was implemented as stipulated in Article 7 of Decree 12 January 1998, n.37
on overcoming the system of provisional clearance of prevention set out in Article 2 of Law
December 7, 1984, No 818.
With the recent measures are in fact adopted the provisions of fire prevention
to be taken by holders of assets, in the annex to the decree of the Minister of Home
February 16, 1982, in cleared provisionally valid , for which
not been issued, the date of entry into force of this decree (June 1, 2006),
specific directives aimed at obtaining the certificate of adjustment
fire prevention.
Decree 29 December 2005 will enter a transitional phase
began over twenty years ago with the law 818/84 that was intended to remedy a previous situation of
irregularities due to both regulatory weaknesses that delay. To recover this situation was introduced
the legally binding instrument, notwithstanding that in law July 26, 1965, No 966 and by Presidential Decree of 29 July 1982
No 577, to allow you to reach the necessary level of security
time-definite and reasonable.
order to meet the objectives of the technical solutions were studied law applicable to the whole range of activities subject
, proportionate to the time application expected in a few months.
These solutions called "Guidelines on the most urgent and essential fire prevention,"
issued by Ministerial Decree of 8 March 1985, were all the measures of prevention and protection that allowed
, according to a detailed procedure involving first
the self-employed person to obtain a provisional clearance.
E 'should be noted that the measures most urgent and essential fire prevention
have been edited in a table associated with each activity subject to control a group of
fire prevention measures deemed appropriate for the particular case. These measures
have been identified, activities for activities, including those provided in a list of general measures (ventilation,
prohibitions and restrictions, limiting the fire load, safety distances, system
exit routes, fire behavior of structures, systems fixed firefighting, security lighting
emergency service in case of fire) promoting, in relation to the short period of adjustment granted
, measures of exercise and simple measures of active protection with respect to
passive protection measures.
Since 1985, subject to a variety of activities, provisions were adopted that plan
specific transitional rules also apply to bridge the
provisional clearance scheme (residential buildings, historic buildings used as museums and libraries, schools, hotels, places of public entertainment
, medical facilities, etc.).. You also need to show that for some tasks to the DM 08/03/1985
already provided full compliance with the laws in force
valid for obtaining the certificate of fire prevention (distributors of motor fuels;
deposits of mineral oil, production, storage and sale of explosives, production, storage,
use, sale of radioactive material, drilling platforms, pipelines).
On the basis of experience gained through the application DM 08/03/1985, which
presented many difficulties of implementation due to the rigidity of the system, and according to
account that the measure is aimed at very diverse activities, it appeared appropriate to establish rules
exceeded clearance Provisional
implemented according to the same criterion of the 1985 Order.
It is thought, therefore, more flexible and adaptable to various types of activities that can occur
each with different characteristics, adopt a system based on
assessment of the risk of fires and the consequent identification of suitable measures to reduce the risk
, borrowing la metodologia di indagine ed individuazione delle misure preventive e protettive
da provvedimenti relativamente recenti e collaudati quali i decreti ministeriali 10 marzo 1998 e 4
maggio 1998.
Al riguardo è opportuno evidenziare che l’applicazione di misure di protezione passiva, che
hanno un impatto rilevante sulle caratteristiche costruttive (resistenza al fuoco, compartimentazione,
ecc.), dovrà essere attentamente valutata e graduata sulla base di una accorta individuazione dei
pericoli di incendio correlati alle condizioni ambientali in modo da considerare gli effettivi rischi in
relazione agli obiettivi di sicurezza assunti. In definitiva la compensazione del rischio, effettuata
secondo il process briefly described and coded in Annex I to that DM 4.5.1998,
must take into account the fire load, ignition sources,
active protection measures, the crowding, the location and characteristics planovolumetriche ,
management measures, etc.. It can not however overlook that the adjustment relates to existing activities
which can not be fully applied the same criteria for new buildings
implementation. To this end, paragraph 2 of Article 2 of Decree refers, in addition to general criteria, including the criteria established by DM
10.3.1998.
For air heat and gaseous fuels for
garages, considering that the specific industry regulations, enacted after the decree
March 8, 1985, do not contain transitional provisions for exceeding the speed of clearance
provisional plans for a specific reference to these regulations, with appropriate details and exclusions
.
It should be noted, finally, that the directives of the Ministerial Decree 29 December 2005, referring to activities in
cleared provisionally valid, apply, of course, the activities
existing at 10 December 1984, the date of entry into force of Law 818/84.
DEPUTY HEAD DEPUTY INSPECTOR GENERAL CHAPTER
(Mazzini)
Il sottoscritto, iscritto presso l'elenco del Ministero dell'Interno, esegue lavori di richiesta dei Certificati di Prevenzione incendi per tutte le attività interessate a tale procedimento, in particolare specializzato per pratiche CONDOMINIALI dal 1984.
Per richiesta di informazioni inviate email : caso.gianfranco@virgilio.it
o chiamare il cell. 3405268303
0 comments: